As part of an Indefinite Delivery Contract (IDC) with Oconee County, the Oconee Economic Alliance commissioned Davis & Floyd to provide a feasibility study for sewer service operated by Oconee Joint Regional Sewer Authority to the Fair Play and I-85 Corridor.

Sanitary sewer infrastructure did not exist along the I-85 corridor in southern Oconee County except for a small package waste treatment plant serving the needs of the SC Welcome Center facility. The study and Preliminary Engineering Report (PER) presented a master plan approach for sewer expansion projects after analyzing potential areas of development with county staff.

To make the project feasible, Davis & Floyd developed a master plan with a phasing plan. The plan included force mains, pump stations, and gravity sewer to service most of developable parcels.

We also assisted with obtaining grants.

SERVICES PROVIDED:

  • Construction Administration
  • Engineering Services & Design
  • Grant Funding Assistance
  • PER
  • Permitting