As part of an Indefinite Delivery Contract (IDC) with Oconee County, the Oconee Economic Alliance commissioned Davis & Floyd to provide a feasibility study for sewer service operated by Oconee Joint Regional Sewer Authority to the Fair Play and I-85 Corridor.
Sanitary sewer infrastructure did not exist along the I-85 corridor in southern Oconee County except for a small package waste treatment plant serving the needs of the SC Welcome Center facility. The study and Preliminary Engineering Report (PER) presented a master plan approach for sewer expansion projects after analyzing potential areas of development with county staff.
To make the project feasible, Davis & Floyd developed a master plan with a phasing plan. The plan included force mains, pump stations, and gravity sewer to service most of developable parcels.
We also assisted with obtaining grants.
SERVICES PROVIDED:
- Construction Administration
- Engineering Services & Design
- Grant Funding Assistance
- PER
- Permitting