Community Development
Industrial
Greenwood Speculative Building
Solutions
Davis & Floyd took the project from planning to execution for this 100,000 SF precast concrete building expandable to 200,000 SF with an additional 50,000 SF pad located in the rear of the property. We designed the grading, parking lot, access road, and 1.04-acre stormwater pond.
Services Provided
- Civil Site Engineering
- Stormwater/Drainage Design
- Drone/Aerial Photography